We will begin construction on your street Tuesday, March 10th, weather permitting. We will be tearing out and replacing the busted up concrete panels within your neighborhood.

Your streets will remain open during the majority of these repairs, but sections will be closed on the days we are tearing our and pouring concrete. If a panel in front of your driiveway needs to be removed you will be notified a day before hand so that way you can park either on the street or in a neighbors drive while access to yours is closed. We will place signs at the end of each block alerting you that we are working on the street.

When possible, please keep your vehicles in your driveways and out of the roadway during this process.

Please be cautious of the large machinery while the road is under construction, and be aware that there may be delays getting in or out during certain phases of construction. Also please don't allow children to play on or around the construction equipment after work hours.

Our normal work hours are from 7 am. until 5 pm. Monday through Friday. There are some occasions that we will work on Saturday to get a jump on rain delays or to make up rained out work days.

Thank you for your cooperation!

Silver Star Construction

Jason Shawn, Project Manager

Phone: 405.317.2877